How long does it take to build a website?

By Adnan, founder of Webicode · Updated · 6 min read

Short answer

Most websites take 2 to 8 weeks to build. A simple 5-page website takes about 2 weeks, a custom-designed business website takes 4–5 weeks, and an online store takes 4 to 8 weeks. The biggest cause of delay is usually waiting for content and feedback, not the building itself.

Website timeline estimator

How long will your website take?

Answer four quick questions to see a realistic build time and launch date.

1. What kind of website do you need?
2. Is your content (text and images) ready?
3. How quickly can you give feedback?
Estimated build time5–6 weeks
Get a fixed timeline

An estimate based on our typical projects. Your quote includes a fixed timeline agreed before work starts.

Timeline by website type

How long does each type of website take?

The size and type of site matter most. These are the typical timelines for our projects, from the first call to launch.

Typical website build times and starting prices (USD)
Type of websiteSizeBuild timeStarting price
Landing page1 pageAbout 1 weekQuoted per project
Simple websiteUp to 5 pagesAbout 2 weeksfrom $500
Business website, custom designUp to 15 pages4–5 weeksfrom $1,470
Online store (WooCommerce)Up to 25 products to start4–8 weeksfrom $1,050
Large site or web appMany pages or custom features8+ weeks, agreed in your quotefrom $2,940

UK prices start from £750. See the WordPress cost guide for what each package includes.

Week by week

What happens each week of a website project?

Here is how a typical 4–5 weeks custom website runs. Smaller sites follow the same steps, just faster.

  1. Week 1

    Plan

    A call about your goals, then a page plan (sitemap) and a fixed quote with a timeline.

  2. Week 1–2

    Design

    Homepage and key pages designed in Figma. You give feedback and approve the design.

  3. Week 2–4

    Build

    The site is built, mobile-first, with your content, forms and SEO basics added.

  4. Week 4

    Test

    Every page is checked on phones and computers. You review the finished site.

  5. Week 5

    Launch

    The site goes live, with training for your team and 30 days of support.

Design

How long does it take to design a website?

The design stage usually takes 1 to 2 weeks. First the pages are planned, then the homepage and key pages are designed in Figma. You review them, ask for changes, and approve the design before any building starts. Approving the design first saves time, because changing a finished site is much slower than changing a design.

Delays

What makes a website take longer to build?

Most delays come from waiting, not from building. These are the six most common causes.

Content is not ready

Waiting for text, photos or product details is the most common delay. Have your content written before the build starts.

Slow feedback

Each day you wait to reply adds a day to the project. Fast, combined feedback keeps things moving.

Too many people approving

When several people must sign off every step, rounds of changes multiply. Choose one decision-maker.

Changing the plan halfway

New pages or features in the middle of a project push the launch back. Add them after launch instead.

Integrations and migrations

Connecting a CRM, booking tool or payment system, or moving an old site, adds testing time.

Complex custom features

Calculators, member areas or custom databases need extra design and testing.

Launch sooner

How can you get your website built faster?

Six simple steps cut weeks off most projects:

  1. Write your content before the build starts.
  2. Choose one person to give feedback and approve.
  3. Reply to questions within one or two days.
  4. Start with the pages you need now, and add the rest after launch.
  5. Send all feedback for each round in one message.
  6. Pick a developer who works during your business hours.

Quick builds

Can a website be built in one week?

Yes, if it is a one-page site or landing page and the content is ready. A full business website in one week usually means skipping planning, design or testing. That saves days now but often costs more to fix later.

US and UK

Is the timeline different in the US and UK?

No. Building a website takes the same time wherever you are. What changes the timeline is how quickly feedback moves. Working with a developer who is available during your business hours, whether you are in New York or London, keeps every step on schedule.

FAQ

Website build time: common questions

Fixed price, fixed timeline

Know your launch date before you start.

Free 30-minute call. You get a fixed price and a fixed timeline within 48 hours, for US and UK businesses.

Get your timeline and quote